Default Re: Huawei CDMA E BTS Max Power??? HI I think it can be more than 20W because the RF board support MAX 60W. The 3rd Global CDMA Operation and Development Forum, themed. To illustrate this further, we can note that Huawei BTSCE power With Huawei latest CDMA BTS products, based upon the physical network. indoor type) and BTSAC (for outdoor type) are The complete series of CDMA BTSs, and relevant Thus, for the same traffic in a sector, a Huawei BTS.
Author: | Ner Kale |
Country: | Latvia |
Language: | English (Spanish) |
Genre: | Travel |
Published (Last): | 6 September 2014 |
Pages: | 268 |
PDF File Size: | 8.21 Mb |
ePub File Size: | 9.51 Mb |
ISBN: | 150-7-77657-509-2 |
Downloads: | 84883 |
Price: | Free* [*Free Regsitration Required] |
Uploader: | JoJorisar |
Huawei BTS Baseband Subsystem
Feed back the situation to the local Huawei Representative Office. Watch out for the sharp edges on the RF fan panel during the dcma of RF cables lest it hurt your fingers.
To avoid damaging equipment inside, do not apply too much force. For the 24 V power input, the voltage drop of the cable from the 24 V power supply system to the power input port of the BTS must be less than or equal to 0. Page of 93 Go. Connect the two probes to the paint-free place of the base and the expansion bolt. Page 70 – Distributing Protection Grounding Cables GND cables for indoor cabling racks and for outdoor cabling racks.
The huaawei section also explains how to install cabinet assemblies on the cement floor without sufficient bearing capacity. They huawej used for the convenience of installation description.
The power cable and the grounding cable are routed straight and bundled neatly.
Installing the Lower Support To install the lower support, proceed as follows: Fix them onto the units. The BTS in the multi-channel mode does not support the power synthesis function.
Page 14 – Power Supply Conditions of the Equipment This section introduces how to install the power module and what to pay attention during the installation. O 2 Configuration The O 2 refers to an omni cell with two carriers.
CDMA grows greener – Huawei Publications
Chapter 4 Installing Cables introduces the categories of cables installed on site, cable distribution methods, and procedures of connecting various cables in BTS cabinet. Please feel free to contact our local office or company headquarters. The cabinet is placed upside down. Paint the whole support with rustproof coat and top-coat. Make sure that all the power modules are well connected with the backplanes, and that other boards and modules such as the CTRM and CHPA are not inserted in the slots huaawei the backplanes.
Fasten the cdmma bolt sets in the following order: When positioning the cabinet, try to avoid the interference between the installation supports and the antistatic floor framework. Installing Power Cables For the 24 V power input, the voltage btx of the cable from the 24 V power supply system to the power input port of the BTS must be less than or equal to 0. Figure shows how to install a BTS cabinet on the cement floor. The depth of the hole must range from 52 mm 2 in.
Figure Installing a board 2 Tighten the screws clockwise on the front panel, as shown in Figure The bgs of the coat must be the same as or similar to cvma of the cabinet. Note, Comment, Tip, Knowhow, Thought: Conducting Insulation Test To conduct an insulation test, proceed as follows: Tools The following tools are required: Clamp the cables to the bracket.
When installing the RF cable, connect unused connectors to matching load and secure them. Normally, the fan box is installed upon delivery.
Make sure the support is level and then cross-fasten the bolts of the lower support to 45 N-m in-lb with a torque wrench. Administration Building, Huawei Technologies Co.
Huawei BTS3606 Installation Manual
The sectional area is Got it, continue to print. Environmental Bs This product has been designed to comply with the requirements on environmental protection. Do not bend an optical fiber to a right angle upon distribution. Connect the other end to the DB9 socket of the power backplane. Comments to this Manuals Your Name. If the outer package is damaged or soaked; or the equipment is soaked and becomes rusty, stop unpacking and find the cause. Installing Or Removing Side Doors 3.
Connect one end of the cable to the working ground of the EAC. Installing Other Functional Modules Normally, the fan box is installed upon delivery.
Diagonally fasten them to a 45 N-m in-lbas shown in Figure