AH-64D PPC PDF

The Flight Performance Models (FPMs) embedded in the PPC application are based on flight test data and the performance charts in the AHD Operator’s. This manual provides specific guidelines for executing AHD aircrew Performance planning card (PPC) DA Form R (UH/AH Get the da form 64 r. Description of ah 64d ppc pdf. DEPARTURE PA FAT LOAD TAKEOFF GWT lb SINGLE ENG DUAL ENG FUEL MSN ATF ETF TR MAX .

Author: Guzshura Togal
Country: Mali
Language: English (Spanish)
Genre: Life
Published (Last): 8 January 2007
Pages: 227
PDF File Size: 5.49 Mb
ePub File Size: 12.29 Mb
ISBN: 298-8-60225-956-5
Downloads: 86540
Price: Free* [*Free Regsitration Required]
Uploader: Dazahn

A valuable lesson learned from this deployment is that units should focus early on power management issues and train accordingly so that they are prepared when deployed.

We knew that it would not be opc before power was a luxury that we would not have.

I slowly increased the power until I drooped the rotor and an-64d decreased the collective. Kandahar is approximately 3, feet mean sea level MSL and can be characterized as high desert. By the end of April, the temperature at Kandahar was nearing degrees Fahrenheit.

  H CLAY TRUMBULL BLOOD COVENANT PDF

AHD Block 2 PPC Book – Study Material

We arrived in Afghanistan near the end of January and were based out of Kandahar International Airport. The racetrack patterns and running fire tactics we utilized were necessary due to insufficient power to hover and to increase our own survivability.

Our first mission took us from Kandahar to Bagram Airbase to refuel and then on to the eastern city of Khowst. This cell always contained at least one of the unit instructor pilots. We quickly learned that power management was a skill necessary to survive our deployment.

AH-64 Apache Operations In Afghanistan

Performance planning was a critical part of each mission. On a daily basis, we had power available to hover out of ground effect OGE.

Within three weeks of our arrival, our missions started taking us to higher and higher altitudes.

While en route to Khowst, we crossed ah-664d snow-covered mountain at 11, MSL. During our missions in Afghanistan, we had two aviators assigned to our performance-planning cell.

  FOUNDATIONS OF EPIDEMIOLOGY LILIENFELD PDF

AH Operations In Afghanistan

During the deployment, we were exposed to a wide range of temperatures, a variety of flight environments, and altitude extremes that we had never operated in before.

Each mission required performance planning for altitudes, temperatures, and gross weights ha-64d were much higher than we normally operate.

The terrain is relatively flat with rolling sand dunes 10 miles west and a mountain range approximately 15 miles to the north. We had already conducted numerous missions to include Operation Ah-64r. During the winter months at Kandahar, our aircraft performed well.

We adapted to this environment well, but were fortunate to have a wealth of experienced aviators in our company.